
Roarr! Dinosaur Park
Adrian James Acoustics
Adrian James Acoustics faced a problem that demanded both technical mastery and the kind of judgment that comes from understanding people. They delivered on both counts, turning a genuine conflict into a shared vision for what the park could become.
Acoustic Challenge
How do you control the cries of Pteranodons while expanding a family attraction adjacent to a residential area with a history of noise complaints?
This project is a rare and imaginative application of noise control at source, adapted to electro-acoustic dinosaur simulations. The consultants demonstrated a strong understanding of loudspeaker directivity, source placement, and electro-acoustic control systems, applying these to manage unusual and intermittent sound sources in a way that was both technically sound and sensitive to public perception.
A key success of the project was the way it earned trust from planners and local residents. The team approached the challenge not just by modelling the future impact of the expansion, but by proactively addressing pre-existing issues from the current park – a move praised by the judges as a smart and community-focused strategy that helped build stakeholder confidence. Through clear communication, rigorous site surveys and thoughtful collaboration with the local authority, the project secured planning permission despite significant initial resistance.
Judges’ Feedback
The judges recognised that the project made use of a full suite of acoustic tools including background noise surveys, directivity analysis, environmental modelling, and public-facing sound demonstrations. Importantly, the consultants considered the relevance of standards like BS 4142, concluding with confidence that it was not applicable once noise sources were made inaudible off-site.
“their work was instrumental in assisting us in obtaining a successful planning permission, and I have subsequently recommended them to clients for many other projects.”
– Planning Consultant
Judges praised the technical thoughtfulness, particularly in speaker orientation and spectral analysis, as well as the team’s ability to build consensus by fixing existing problems to gain trust and earning buy-in for the long term.
